Bahamas

The Cove at Atlantis Plans 600-Suite Makeover and New Beach Club

The Cove at Atlantis Paradise Island is renovating all 600 of its ocean- and harbour-facing suites in the Bahamas. The phased project also includes a redesigned lobby, an adults-only beach club and a new poolside restaurant. Atlantis is targeting April 2027 for completion, the year The Cove marks its 20th anniversary.

The first refurbished suites are expected back in service in late November or early December 2026, ahead of the festive season. The Cove continues to welcome guests as work progresses. The first suite releases and the completion of the wider resort project are separate milestones for travellers considering a winter stay.

All 600 Suites Get New Interiors

Crews are stripping suite interiors back to their structural framework. The renovation will bring new stone finishes, flooring, carpets, furniture and bathrooms to every suite. A softer palette of beige and ivory will run through the rooms, with the water views remaining the focal point.

Edge of Architecture, Champalimaud Design and AvroKO are working on the redevelopment. The overhaul covers suites overlooking both the ocean and the harbour. As accommodation returns to service in phases, guests booking around the festive period can ask Atlantis whether their room category includes a refurbished suite.

A Redesigned Lobby Introduces Personalised Check-In

The resort is also redesigning its main entrance and lobby, known as The Nav. Plans call for a dedicated VIP check-in area and a personal concierge to assist with arrivals. The concierge will handle registration and escort guests to their suites as part of the planned service.

Dedicated butler assistance also forms part of the redevelopment. The project information does not specify which room categories will include it. For guests comparing suite options, the services attached to each category will be as relevant as the new interiors.

Adults-Only Beach Club Draws on the South of France

The redesigned Beach Club will take its cues from the South of France and serve eligible adult guests staying at The Cove. Plans include swimming pools, hot tubs, terraced daybeds, direct beach access and private cabanas with dedicated hosts. Live music and poolside gaming are also part of the concept.

Atlantis plans to offer mobile ordering, chilled towels and a roaming ice-lolly cart. The club will bring dining and entertainment into the same outdoor space, giving guests the option to spend much of the day by the water. An external hospitality operator is expected to manage the venue, with its identity still to be announced.

Open-Fire Cooking Joins The Cove’s Dining Line-Up

A new outdoor restaurant beside the pool will focus on open-fire cooking and local seafood. Breakfast, lunch and dinner are planned. A New York restaurateur is associated with the project, although the resort has yet to name the operator.

The restaurant will join Fish by José Andrés and Paranza, Michael White’s Italian restaurant. The wider project also includes changes to Perch, Sea Glass Lounge and the club-level Lapis Club. These updates will affect several parts of the dining experience, from breakfast and poolside meals to evening drinks.

Mandara Spa has already reopened after a separate refurbishment. Its new entrance features a glass walkway over water. The broader wellness programme includes the Metawell Relaxation Lounge and daily activities, giving guests options away from the beach and pool.

What Guests Can Expect During the Renovation

The Cove is keeping the property open by scheduling construction in phases. The resort says it is insulating floors immediately above and below active work areas to reduce noise. Guests can also reach facilities elsewhere at Atlantis by walking or using the resort shuttle. Those include the Aquaventure water park, golf course, marina, shops and restaurants.

The phased schedule matters most for guests booking around a particular feature. A refurbished suite may be available before the Beach Club or new restaurant opens. Anyone planning a Christmas or New Year stay can check which accommodation and venues will be available on their dates.

For Atlantis, the first refurbished suites are the immediate milestone. April 2027 remains the target for completing the wider project, when the redesigned accommodation, arrival services, dining and beach facilities are intended to come together.

 

For more travel news like this, keep reading Global Travel Wire 

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top